Bank Run Gravel Backfill Cost |
Construction ITEM DESCRIPTION Excavation unit cost for backfilling foundations or other excavation work with bank run gravel, using a small "Bobcat" style loader. Unit Size One cubic yard of gravel fill. Labor and Equipment Costs We figure about 6 1/2 cubic yards of gravel fill per hour of loader time (with operator), plus one unskilled laborer hour for every 100 cubic yards of fill work. This price assumes that the gravel is piled close to the destination. Add additional time if there is a long hauling distance. Material Costs One ton of bank run gravel per cubic yard of fill. Suggested Quantity Goldenseal calculates the foundation backfill volume, using fairly simple geometric assumptions. Adjust the quantity if your conditions are different. Source of Construction Pricing This pricing is based on actual timing of two remodeling projects done by Turtle Creek Construction. Places Included Architect Starter File, Construction Starter File, Developer Starter File Comments Click here for more about Goldenseal construction estimating software. For other excavation estimating costs, click here. ![]() |
Directory | Previous | Next | Getting Started Manual | Reference Manual | Site Map | Website © 1987-2012 Turtle Creek Software |