concrete post filling
|
Construction
Category |
SubCategory |
Concrete |
Concrete Footings |
Construction ITEM DESCRIPTION |
Construction cost for filling
post holes around 4x4 deck or porch
posts, using site-mixed concrete.
|
Labor
Costs |
We figure 1/2 hour of unskilled labor
per post. That is about what
it takes for mixing concrete
from bag mix or raw materials,
shoveling and tamping.
You can probably reduce
the hours by 50%
if you have a large number
of post holes to fill, and
use a ready mix truck. Drop
the labor hours even more
if you use a concrete pump
truck (for larger projects,
or if you are also pumping
and pouring other concrete
on the site). |
Material
Costs |
We figure a bit of concrete (40 posts
per cubic yard).
METRIC VERSION-- 45 posts per cubic
meter of concrete. |
Hard Construction Costs, Typical |
$11.78 US per post hole
|
Suggested
Quantity |
No suggested amount. Enter the number
of porch or deck posts that will be embedded in concrete.
|
Source
of Construction Pricing |
Crew timing from a large number of
porch and deck projects done by Turtle Creek Construction.
|
Places Included |
Architect Starter File, Construction
Starter File, Developer Starter File
|
Click here for more about Goldenseal construction estimating software.
Click here for other concrete construction costs.
 |
|