Changing Assemblies |
Changing a Construction Assembly In the BidMagic Material Takeoff Software, each assembly can include up to eight different materials. When you are in the assembly editor, you can change the materials used, their quantities or waste factors. The picture above shows the Assembly Editor for 2x4 wood studs. The name of the current assembly is always shown at the top of the window. The current assembly price is also displayed. It is calculated automatically whenever you change materials, quantities or waste factors. The current material category shows a material price category from which to add new material items to the assembly. All the material components of
the assembly are displayed in a line-by-line format. Every assembly can have up to eight different
material components. For each component, the Assembly
Editor lists: In the example above, for every lineal foot of 2x4 wood stud framing, the assembly includes:
|
|