Septic System Percolation Test Cost |
Construction ITEM DESCRIPTION Construction unit cost covering the "perk test" for a rural septic system. Unit Size One test. Labor Costs We figure 4 skilled hours and 2 unskilled hours, plus 2 hours of backhoe time with operator. Material Costs None included. You might want to include the cost of the perk inspection here, if it is not included in the building permit fee. Suggested Quantity One per project. Source of Construction Pricing We used job cost figures from a couple of jobs that required a percolation test. The time includes digging and cleaning the test pit, lugging water, waiting for the inspector and backfilling the hole after the inspection. The time for this item may vary, depending on the perk testing procedure that is required in your area. HINT-- You might want to add more time if there is nothing else productive to do while you wait for the inspector. Places Included Architect Starter File, Construction Starter File, Developer Starter File, Metric Starter File Comments Click here for more about Goldenseal construction estimating software. For other sitework estimating costs, click here.
|
![]() Directory | Previous | Next | Getting Started Manual | Reference Manual | Site Map | Website © 1987-2012 Turtle Creek Software |