Sewer Drain Replacement Cost

 

Other Links

Swiss Army Knives

New & Used Swiss Army Knives

Leatherman Tools

New & Used Leatherman Tools

 

Goldenseal Construction Estimating Software

Assembly name-- In Goldenseal Estimating Software

replace existing line


Construction Category SubCategory
Rough Plumbing Plumbing Utility Hookups

Construction ITEM DESCRIPTION

Plumbing estimating unit cost for repair or replacement of an existing drain line to a sewer or septic tank connection.


Unit Size

Lineal foot.


Labor Costs

We figure an unskilled worker can remove about 50 feet of plumbing line per hour, and that an skilled worker can install about 20 feet of new plumbing per hour.

This price only includes placement of the sewer pipe in an existing trench. It does not include any excavation or backfilling costs, nor the cost of securing deep trenches to OSHA standards. The removal cost is for old PVC line-- for cast iron you'll need some extra time.


Material Costs

One foot of schedule 40 PVC pipe, plus 1 connector for every 6 feet of line.


hard COnstruction Cost, Typical

$7.69 per lineal foot


Suggested Quantity

No suggested quantity. Enter the length of sewer pipe that needs replacing.


Source of Construction Pricing

Based on crew timing and/or job costing data from a few plumbing installations done by Turtle Creek Construction.


Places Included

Architect Starter File, Construction Starter File, Developer Starter File


Comments

none

For more about Goldenseal construction estimating software, click here.

Click here for other rough plumbing construction costs.