![]() |
|
||||
Construction Unit Costs |
|||||
| A listing of unit costs included in the Goldenseal construction estimating software. NOTE-- Goldenseal includes 1200+ construction assemblies that cover the complete range of work from excavation to framing to trim and cleanup. We don't have detailed write-ups for all of the assemblies yet, but you can still see them all in the Sample Company File. HINT-- To see a list of all assemblies in Goldenseal, choose Inventory from the Reports menu, choose Assemblies from the submenu, and then click the Update button. Double-click on any item to see the labor and material components and a brief description for the Assembly. |
|
| Construction Unit Costs General Conditions Site Preparation Excavation Concrete Masonry Floor and Roof Framing Wall Framing Porch and Deck Framing Ironwork Roofing Windows Rough Plumbing HVAC (Heating, Ventilation, Air Conditioning) Rough Electrical Exterior Trim Siding |
Coming Soon! |
Previous | Next | Getting Started Manual | Reference Manual | Site Map | Website © 1987-2005 Turtle Creek Software |
|