Cost Summary Switched |
|||||
Problem Cost Summary in an Estimate shows the wrong values in the equipment and material costs per unit. Diagnosis They click the Cost Summary button in a version 2.9 estimate. The cost per area for equipment and materials are switched. Solution This is a problem in 2.9 only. It's fixed in version 3.0 of Goldenseal Estimating Software. They can do the following to make the switch right away: Comments Entered 10/5/04 by Dennis |